Inspection Planning Worksheet
The ProtoRFQ inspection planning worksheet maps buyer-defined critical characteristics to measurement methods, timing, sampling, and shipment-record expectations.
Controlled record
v1 · effective Jul 29, 2026Owner: ProtoRFQ RFQ deskThe inspection planning worksheet records which dimensions or characteristics control acceptance, their drawing datums, a suitable measurement approach, when they are checked, what sampling or first-article scope applies, and which records must accompany the order.
Control 01
Characteristic selection
Inspection scope starts with the buyer-defined features that control function instead of assuming every dimension has equal risk.
Drawing revision, part number, material condition, process stage, and quantity.
Dimensions controlling fit, sealing, alignment, travel, or assembly.
Applicable datum references, drawing notes, and acceptance condition.
Control 02
Method and timing
The worksheet assigns an inspection approach without promising unconfirmed equipment.
Suitable measurement method for each controlled characteristic.
First-article, in-process, sample, or final-inspection timing.
Measurement condition before or after coating, heat treatment, or assembly.
Control 03
Records and open questions
Required evidence and unresolved acceptance questions are visible before release.
Measured data, material records, finish records, or shipment-report requirements.
Sampling expectations and any buyer-specific reporting format.
Method or interpretation questions that require buyer approval.
Evidence boundary
What this record does not claim
The worksheet documents the agreed inspection scope; it is not a certification.
Measurement equipment is selected and confirmed per order.
The worksheet does not imply that every dimension receives a recorded result unless the quote says so.
FAQ
Inspection Planning Worksheet
Does every dimension need a measured report?
No. Reporting should match part risk and buyer requirements. Critical characteristics may need recorded data while other dimensions can follow the agreed sampling or standard inspection route.
When should inspection be planned relative to finishing?
Before production release. The plan should state whether a characteristic is accepted before coating, after finishing, in both conditions, or after assembly.
Can the worksheet specify CMM inspection automatically?
No. The appropriate method depends on geometry, tolerance, access, and available qualified equipment. The method is confirmed for the specific order.
Use the process
Attach the controlled drawing and inspection requirements.
The checklist becomes useful when it is applied to the current revision and the actual acceptance conditions.