Quality approach

Define the evidence before production starts.

Quality control starts at RFQ intake. The public site stays limited to process claims that can be supported, while draft or internal-only proof remains hidden until it is intentionally published.

Illustration: pin gauges, a thread gauge, a micrometer and a bore gauge beside a machined flange on a granite table
Illustration

Quote-stage controls

Most quality failures begin as missing information, not machining drama.

The first control is a drawing review that catches revision mismatch, conflicting tolerances, missing material definitions, undefined finish steps, and inspection gaps before the quote is released.

Drawing review

Revision, units, datums, tolerance notes, thread definitions, finish instructions, and unresolved assumptions should be visible before order approval.

Inspection planning

Critical features, measurement method, and shipment records should match part risk. A report requirement discovered after production is already a process miss.

Change control

Material, process, drawing, and delivery changes should trigger an updated written assumption or buyer approval rather than informal shop-floor memory.

First article inspection

What a first article inspection report should cover.

A first article inspection report (FAIR) records the measured result of every characteristic on the released drawing for the first part made by the production route. Ask for it in the RFQ, because the report format, sample size, and who supplies the ballooned drawing all change the quote.

Ballooned drawing

Each dimension, tolerance, and note on the drawing is numbered. The report then lists every balloon with its requirement, the measured value, and a pass or fail result, so nothing on the drawing is left unchecked.

AS9102 FAIR format

Aerospace buyers often require the AS9102 forms: Form 1 for part number accountability, Form 2 for product accountability such as raw material and special processes, and Form 3 for characteristic accountability. State in the RFQ if your contract calls for this format.

When to repeat it

A new first article inspection is usually expected after a drawing revision, a material or process change, a change of manufacturing location, or a long production gap. Write the trigger rules into the order so a repeat batch is not shipped on an outdated report.

Read the first article inspection report guide for the report fields, the AS9102 forms, and what to put in the RFQ.

Publishing gate

Unsupported proof stays off the public site.

Company identity claims, certifications, equipment lists, customer names, and case-study outcomes require a published evidence record. Until then, the process can be described, but the proof item stays private.

Traceable media

Workshop and product media should map to an internal source record before publication so the site does not imply unsupported capability or ownership.

Issue context

A useful nonconformance record needs the drawing revision, affected quantity, measured result, supporting evidence, and requested disposition.

Evidence status

`draft` and `verified` records help internal control, but only `published` records appear on public pages. That keeps marketing language subordinate to the evidence gate.

Published evidence

Public evidence register

No internal record is displayed here unless it has been promoted to published status.

Start a private RFQ

sales@protorfq.comWhatsApp · +86 180 2218 4200

or send files now

Open the full RFQ page